8-12-2021 – 12-12-2021

 

Observation:

8/12: Official – Bel

  • Check floor marking!
  • Post shop stickers on the floor

 

9/12: Special Design Moving In – Harry + Leo

Issue:

  1. 人员分配不充分=>有人是比较闲的
  2. 厂的materials出错(切割的地方不好,木结构切到中间受力部分;尺寸出错)
  3. 客户下午来,有许多adjustment,浪费时间!

Improvement

  1. 针对前两个,要做好人员分配,可安排一些人手去整理物资
  2. 针对第3个,则要即使沟通!
  3. 针对第4个,Harry说要先提前弄好客户将会用到的物资,比如整体结构,柜子,让客户可以忙起来!

 

10/12: Open ceremony:

  • Client broke a key
    • This is their fault, we should tell them be careful next time. and don’t reply no need to pay!

 

12/12: Move-out:

Sustainability

  • Lot of materials are being wasted: water bottle, leaflets, foamboard, wood structures (furniture: desk, chair), plastic, paper box…
  • Cost-effectiveness? 成本效益?
  • 有一家做的挺好:它的structure是用了aluminium/steel 可以不断reuse
延伸阅读
  1. 上一篇: Important: 投资思路的To-do list
  2. 下一篇: MT学习周记录-01

发表评论

您尚未登录,登录后方可评论~~
登陆 or 注册

评论列表

暂无评论哦~~